A Great Southern Press Site
Username:   Password: Forgot Password?
  

Protecting Arctic marine pipelines against subgouge deformation

Madeline Chua, Professor Andrew Palmer, and Hendrik Tjiawi


Gouging ice masses are a threat to underwater pipelines in the Arctic. The problem is made more severe by the fact that the soil under an ice mass is dragged forward as it gouges, so that a pipeline might not be safe even if it is trenched deep enough for the ice itself to clear it. Subgouge deformation is incompletely understood, and predictions are uncertain.

The scheme describe here makes it possible to eliminate subgouge deformation, by placing a weak layer above the pipeline and below the gouging ice mass. The layer is not strong enough to transmit downwards the shear forces that induce the deformation. The authors describe an improved version that lends itself to straightforward installation.



Optional promotion code:

EnLink Midstream to construction 72 km condensate pipeline in Ohio
19 Aug 2014
Ukraine committed to providing gas to Europe: Naftogaz
14 Aug 2014
Call for papers: the “Unpiggable” Pipeline Solutions Forum
14 Aug 2014
Blueknight Energy to build Knight Warrior Pipeline
14 Aug 2014
Columbia Pipeline Group proposes Leach Xpress Pipeline; construction to begin 2016
13 Aug 2014
Practical Pigging Training, Rio
CTDUT, Rio de Janeiro, Brazil
1 – 5 Sep 2014
Subsea Practical Pigging Training
KTN, Bergen, Norway
16 – 18 Sep 2014
Fixing Pipeline Problems Conference & Exhibition
Berlin, Germany
21 – 24 Oct 2014

Want to see the latest? Follow Pipelines International on Twitter.